28TH JULY 2025
Dear All,
We are back in talks with Heathrow to ensure Stanwell Moor is fully WPOZ compensated, however the first thing I need resolved for residents is that due to historic desktop modelling and 30-year old outdated Leq contours (69) homes in our village are currently excluded from HAL’s Noise Insulation Scheme [NIS]
We are back in talks with Heathrow to ensure Stanwell Moor is fully WPOZ compensated, however the first thing I need resolved for residents is that due to historic desktop modelling and 30-year old outdated Leq contours (69) homes in our village are currently excluded from HAL’s Noise Insulation Scheme [NIS]
I will be arranging another meeting with HAL in the next week or so but in the meantime I’m launching a WhatsApp Group (exclusively) for the residents I am representing for this particular campaign.
(Please “DO NOT” join if you are already included, or having you windows and doors done at this time).
You should get a link to JOIN the “EXCLUDED 10%” soon but if you don’t please contact me.
If you do get an invite can I ask that you help to build this important group by asking your ‘excluded neighbours’ to JOIN as we need the group to be as populated as possible.
As previously stated: I have lodged a petition at our last meeting signed by every excluded household and I have informed Heathrow that I expect every home in the most airport-blighted village within the Heathrow perimeter to be included and eligible for the 100% funded insulation scheme.
Due to this campaign Heathrow Airport has now extended the deadline date for Stanwell Moor residents to register.
Please let me know if you can sign up and if this link to the new whatsapp group works?


